Skip to content
Entourage
Case studyPharma

Fill-and-Finish Turnaround in Sterile Manufacturing

Pharmaceutical company with an in-house fill-and-finish operation

High downtime, recurring batch losses and staffing bottlenecks weighed on the fill-and-finish operation and lowered production efficiency.

The challenge

The situation

High equipment downtime and recurring batch losses shaped daily operations in the fill-and-finish area. Inefficient cycle times, staffing bottlenecks and inconsistent quality management practices compounded the situation, driving down production efficiency while costs rose.

Our approach

What we delivered

01

Reduction of cycle and lead times in the fill-and-finish process

02

Relief of bottlenecks in personnel planning

03

Standardised work at lines and shift handovers

The outcome

Results & impact

51% more production

Increase in production output in the fill-and-finish operation.

52% fewer overdue deviations

Reduction in overdue deviations through standardised workflows.

5.6% higher yield per batch

Improved yield per batch at consistent quality.

16% lower absentee rate

Reduced absenteeism across the workforce.

In summary

The fill-and-finish operation delivers a more consistent production output at stable quality, with markedly fewer overdue deviations and lower absenteeism.

Sources
  • Entourage project experience (anonymised)

Your project

A comparable project?

Briefly outline your situation. We'll respond with an initial assessment, usually within one business day.

Prefer direct? +41 61 271 23 80
info@theentourage.ch

  • Reply usually within one working day
  • 4 offices: DE · CH · IT · US
  • 100% life sciences